Log In


Reset Password
Archive

Drying Out Town Hall South

Print

Tweet

Text Size


Drying Out Town Hall South

Jesse Cabral of JC Construction, Inc operates an excavator October 8 at Town Hall South where the town is installing a new curtain drain system to divert groundwater away from the building. The drainage repair project is expected to keep the lower level of the building from becoming wet during periods of high groundwater.                                                  – Bee Photo, Gorosko

Comments
Comments are open. Be civil.
0 comments

Leave a Reply