Log In


Reset Password
Archive

Date: Fri 18-Jul-1997

Print

Tweet

Text Size


Date: Fri 18-Jul-1997

Publication: Bee

Author: ANDYG

Quick Words:

sewage-collection-WPCA-PSG

Full Text:

WPCA Selects Operator For New Sewer System

BY ANDREW GOROSKO

The Water Pollution Control Authority (WPCA) has chosen Professional Services

Group, Inc, (PSG) of Houston, Texas, as its contract operator for the

municipal sewer system.

The sewage collection system has been built and the sewage treatment plant is

undergoing testing. The plant is scheduled to be in operation by September 5.

PSG was among several companies that competed for the job, said Fred Hurley,

the town's public works director.

According to Mr Hurley, the town's contract with PSG likely will run for five

years, with options to renew. PSG will be paid approximately $400,000 to

operate the sewer system for the first year. The town is negotiating payment

to the firm for subsequent years.

In its proposal for a five-year service contract, PSG seeks approximately

$400,000 for the first year of service, and approximately $420,000, $462,000,

$496,000, and $501,000 for subsequent years.

As part of its agreement with the town, PSG will maintain and repair sewage

collection lines, operate the sewage treatment plant, run the four sewage

pumping stations, maintain grinder pumps, and handle sewer billing and

collection.

As public works director, Mr Hurley will oversee the contract between the

sewer system management firm and the town.

All of the service firms which applied to run the sewer system were qualified

to do so, Mr Hurley said.

The town hopes to have PSG on the job before the end of August. The firm will

then do startup work on the sewer system and sewage treatment plant. An

automated control system will be used to help run the sewer system, Mr Hurley

said.

Users are expected to start connecting to the sewer system this fall. When a

property is connected to the sewer system, wastewater disposal will be shifted

from individual septic systems to sewer hookup lines. The tops of septic tanks

will be broken and the tanks will be filled in with earth material. The

demolition and filling of tanks will prevent septic systems from being used

and will prevent possible future septic tank cave-ins, Mr Hurley said.

The price of sewer hookups will vary from property to property based on the

complexity of the plumbing needed. The need to blast rock to install a sewer

hookup would increase installation costs.

PSG Letter

In a letter to First Selectman Robert Cascella, Richard A. White, PSG's area

vice president of client services, writes PSG will offer the town advantages

over hiring other firms.

PSG has 200 employees working within 150 miles of Newtown, according to Mr

White. The firm runs a sewage treatment plant in Seymour similar to Newtown's

plant, so it has staff members with much experience within 30 minutes of

Newtown, he adds. PSG's candidate to run Newtown's plant lives just over 20

miles from Newtown, he writes.

The company has much experience using trailer-mounted sewer line cleaners

similar to the one it will be using in Newtown, according to Mr White.

PSG is the largest contract operator of wastewater and water treatment

facilities in the United States.

Besides the Seymour sewage treatment plant, PSG runs sewage plants in West

Haven and New London. It also has been chosen to run the sewage plant for

Bridgeport.

Other firms which responded to the town's request for qualifications to run

the sewer system included: OMI, Inc, of Greenwood Village, Colorado; Earth

Tech, Inc, of Glastonbury; ST Environmental Services, Inc, of Glen Cove, N.Y.;

United Water of Harrington Park, N.J.; Weston and Sampson Services, Inc, of

Peabody, Mass.; Wheelabrator EOS, Inc, of North Andover, Mass.; and Woodward

and Curran of Dedham, Mass.

The town is under a longstanding state pollution abatement order to rectify

groundwater pollution problems caused by failing septic systems. In 1992,

voters approved spending up to $34.3 million to build a sewer system.

Construction work on the sewer system started in November 1994.

Comments
Comments are open. Be civil.
0 comments

Leave a Reply